What was found
UPON REMOVAL OF RT TRANSITIONAL PNL FWD CARGO BAY FOUND BAFFLE BETWEEN STA 500D TO STA 500E TO BE CORRODED. GROUNDED - YES. REMOVED BAFFLE, UPON FURTHER INVESTIGATION FOUND 100% MAT LOSS, OUT OF LIMITS, INSTALLED NEW R/H BAFFLE BETWEEN STA 500D-500E IAW SRM 51 40 02 0G 0, 53 00 53 1A 2 W .500 O .020 R .00 L .500 D .020.