What was found
ENGINE NR 2 ALTN PWR CHANNEL B CB POPPED. GROUNDED - YES. REMOVED AND INSTALLED ENG NR 2 EEC REF AMM 73-21-60, INSTALLATION TEST PASSED. C/W FADEC SYS TEST IAW AMM 73-21-00,TEST PASSED, GROUND VERIFICATION TEST SUCCESSFUL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ENGINE NR 2 ALTN PWR CHANNEL B CB POPPED. GROUNDED - YES. REMOVED AND INSTALLED ENG NR 2 EEC REF AMM 73-21-60, INSTALLATION TEST PASSED. C/W FADEC SYS TEST IAW AMM 73-21-00,TEST PASSED, GROUND VERIFICATION TEST SUCCESSFUL.