As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
AFTER THE AFTER START CHECKLIST LT ELEV PITOT ILLUMINATED. GROUNDED-YES. REMOVED & REPLACED THE LT ELEV FEEL SYSTEM PITOT PROBE, PER B737-800 AMM 27-31-94. LEAK TEST GOOD, PER AMM 27-31-17 PITOT HEAT. OPERATIONS CHECKS NORMAL, PER AMM 30-31-00.