What was found
SHEAR TIE AT FS 540 LBL 40 IS CRACKED AT AFT FASTNER HOLE. GROUNDED-YES. REMOVED & REPLACED WITH NEW SHEAR TIE AT FS 540 LBL 40, IAW B737-900 SRM 51-40-02-0G-0. PERFORMED LEAK CHECK, IAW B737-900 AMM 28-11-00-300-803, LEAK CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SHEAR TIE AT FS 540 LBL 40 IS CRACKED AT AFT FASTNER HOLE. GROUNDED-YES. REMOVED & REPLACED WITH NEW SHEAR TIE AT FS 540 LBL 40, IAW B737-900 SRM 51-40-02-0G-0. PERFORMED LEAK CHECK, IAW B737-900 AMM 28-11-00-300-803, LEAK CHECK GOOD.