What was found
2 CRACK INDICATION FOUND BETWEEN STAB STA. 129.50 TO 138.70 ON THE L/H SIDE H-STAB LOWER SKING.CRACK #1 APROX. 1.15" LONG.CRACK #2 APROX. 1.25" LONG.BOTH CRACK ENDS AND LENGHTS ARE MARKED IN RED. GROUNDED - YES. REMOVED DAMAGE AT (2) LOCATIONS ON L/H HORZ STAB LOWER SKIN STA 129.50 TO STA 138.70. PERFORMED HFEC OF DAMAGE REMOVAL AREA (2) LOCATIONS AND NO DEFECTS NOTED. FABRICATED REPAIR FILLERS & DOUBLER USING 2024-T3 .071 CLAD PO# 999519.1 AND 2024-T3 .100 CLAD PO# 1015924-1. INSTALLED REPAIR FILLERS AND DOUBLER AND FILLET SEALED AND APPLIED FINISH. ALL WORK PERFORMED IAW B737-800 SRM 55-10-01-2R-11.