What was found
AFT PIT L/H TRANSITION PANEL STA 727+4 - STA 727E+10 HAS CORROSIONDOT N270. GROUNDED - YES. EVALUATED AFT PIT L/H TRANSITION PANEL STA 727+4 - STA 727E-10.ORIGINAL THICKNESS .040",REMOVED .019", MATERIAL REMAINING .021"AND FOUND TO BE OUT OF LIMITS PER B737-800 SRM 53-00-53-1A-2.REPAIRED TRANSITION PANEL STA 727+4 - STA 727E+10 USING BAC 1496-377, 7075-T62 PO: 1014531.1ALL WORK DONE IAW BAC DWG 1496-377, B737-800 SRM 53-00-53-1A-2, SRM 53-00-53-2R-5, SRM 51-40-02, BOEING SOPM 20-41-02TOOL #T8224C CAL DUE 02MAR23DOT REMOVED.