What was found
AFT PIT L/H TRANSITION PANEL STA 727F+10 - STA727H+5 HAS CORROSION DOT:N266. GROUNDED - YES. EVALUATED AFT PIT L/H TRANSITION PANEL STA 727F+10 - STA 727H+5.ORIGINAL THICKNESS .040".REMOVED .021". MATERIAL REMAINING .019"AND FOUND TO BE OUT OF LIMITS PER B737-800 SRM 53-00-53-1A-2.REPAIRED TRANSITION PANEL STA 727F+10 - STA 727H+5 USING BAC 1496-377,7075-T62, PO: 1014531.1.ALL WORK DONE IAW BAC DWG 1446-377, B737-800 SRM 53-00-53-1A-2, SRM 53-00-53-2R-5, SRM 51-40-02, BOEING SOPM 20-41-02. TOOL# T8224C CAL DUE :02MAR23 DOT REMOVED.