What was found
AFT PIT R/H TRANSITION PANEL STA 727B+10 - STA 727F+10 HAS CORROSION DOT N269. GROUNDED - YES. EVALUATED AFT PIT R/H TRANSITION PANEL STA 727B+10 - STA 727F+10,ORIGINAL THICKNESS .040" PER BAC DWG 1496-377, MAT' REMOVED .019", MAT' REMAINING .021" OUT OF LIMITS PER B737-800 SRM 53-00-53-1A-2 FIG D.REPAIRED RH TRANSITION PANEL STA 727B+10 TO STA 727F+10 USING BAC1496-377 7075 T62.040." ALL WORK ACCOMPLISHED IAW B737-800 SRM 53-00-53-2R-5 REPAIR 5. MAT PO:1014531.1 CALIBRATED TOOLING : T8224C CAL DUE 02/MAR/2023 DOT REMOVED.