What was found
DURING CLIMB LT A/C PACK LIGHT ILLUMINATED. RAN THE QH PACK CHECKLIST PAT LT EXTINGUISHED AFTER TRIP RESET WITHIN A COUPLE MINUTES PACK LT ILLUMINATED AGAIN . RAN PACK QRH CHECKLIST AGAIN. TRIP RESET EXTINGUISHED THE LT. CHECKED LEFT PACK TEMP. STARTED RISING AGAIN RIGHT AWAY UNTIL PACK LT CAME ON A THIRD TIME. SHUT DOWN LEFT A/C PACK IAW QRH PRESSURIZATION NORMAL. GROUNDED - YES. FLAP SWITCH CHECKS GOOD, CONNECTOR D46040 PIN M TO GND DURING SEVERAL FLAPS UP AND NOT UP CYCLES IAW WDM 21-51-14. LH DEFLECTOR DOOR FAILS TO STOW AT STEP (9)A AMM 21-51-00-730-802 RADA OP TEST. DEFECTOR DOOR SLOWLY MOVES TOWARD STOWED THEN STOPS HALF WAY. RAM AIR SYSTEM OPS TESTED GOOD IAW AMM 21-51-00-730-802. BITE CHECKED TEMP CONTROL GOOD. RAN PACK, NO FAULTS NOTED. ORIGINAL SUBMISSION DATE: 12/5/2022