What was found
MULTIPLE SPOTS OF CORROSION ON FWD PIT LH TRANSITION PANEL.CIRCLED WITH RED GREASE PEN. GROUNDED - YES. REMOVED CORROSION STATION 500J TO 500G,ORIGINAL THICKNESS .040, REMOVED .015,REMAINING MATERIAL .025,FOUND TO BE OUT OF LIMITS IAW B737-900ER SRM 53-00-53-2R-5.REMOVED DAMAGED AREA, FAB'D LOCATED AND DRILLED. ALODINED PRIMED AND INSTALLED NEW TRANSITION PNL P/N BAC1496-444 PO 1055594.1 IAW B737-900 SRM 53-00-53-2R-5.