What was found
ITEM 255 - CONFIRM CONFORMANCE LH WING INB AFT FLAP REPAIR PLUS ADDITIONAL DAMAGES (DB6 ABD DB8) ACFT GROUNDED. EVALUATED & REPAIRED ITEM 255 LT WING INBD AFT FLAP PREVIOUS REPAIR PLUS ADDITIONAL DAMAGES DB8 AND DB6. LOCATED 49Ï¿½ TO 60.5Ï¿½ FROM THE INBD EDGE OF THE FLAP AND 0Ï¿½ TO 6.75Ï¿½ FROM THE TRAILING EDGE. REPAIR DOUBLER SIZE IS 11.5Ï¿½ TO 6.75Ï¿½. - .032Ï¿½ AND RESTORED FINISH. IAW A320 SRM 57-52-00-300-0-95; A320 SRM 51-25-00 REV 145/01MAY2023; A320NTM 51-10-03-01; A320-200 SRM 51-77-13-911-013; A320-200 SRM 51-21-11; A321-200N SRM 51-77-11-214, SN:4851