What was found
DURING SCHEDULED MTX WORK ON #1 ENGINE, FOUND PRSOV LEAKING. GROUNDED - YES. R&R ENG #1 PRSOV PER AMM 32-11-04. OPS CHECK OK. NO LEAKS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MTX WORK ON #1 ENGINE, FOUND PRSOV LEAKING. GROUNDED - YES. R&R ENG #1 PRSOV PER AMM 32-11-04. OPS CHECK OK. NO LEAKS.