What was found
MANAGEMENT REQUEST FOR FOLLOW UP TO IN-FLIGHT OVERHEAT CONDITION ON ENGINE 2 **(PRI 2)**. GROUNDED - YES. (RESOLVED ON W/O: 1970350 TASKCARD: N/R-00002 ) PER TECH SERVICES NOTE PERFORMED AMM 26-11-01. REMOVED AND REPLACED FIRE DETECTOR LEFT CORE (M1759) AND RIGHT CORE (M1760) ON #2 ENGINE. UNABLE TO INSTALL M1757 AND M1758 DUE TO WRONG PARTS SENT AND TIMEALT DEACTIVATION PROCEDURE USED PER CHAPT 5 TABLE 3 ITEMS 1 & 7ALT DEACTIVATION PROCEDURE REVERSED REF MPM CH 5 TABLE 3 ITEMS 1 & 7 FOR MX. AT THIS TIME ENG FIRE DETECTION OPS TEST PASSED REF AMM 26-11-00TECH SERVICES OKAY TO CLEAR TSR DEFERRAL. TECH SERVICES UMESH NOTIFIED. SEAMC NOTIFIED.