What was found
WHILE ACCOMPLISHING TASK CARD #72-ASA-03 FOUND HIGH PRESSURE SHUTOFF VALVE HPSOV ON #1 ENG LOCKOUT BOLT DAMAGED FROM VALVE. 3 CD PULLED ENG #1 SPAR VLV, ENG #1 IGN L AND IGN R. GROUNDED - YES. PERFORMED ALTERNATE DEACTIVATION PER ASA CHAP 5-07-01 TABLE 3 ITEM 7 51122.REMOVED THE ENG #1 HPSOV REF AMM 36-11-07 INSTALLED NEW HPSOV REF AMM 36-11-07-4--=801 STEPS A THRU H2 RESET 3 CBS 51122 9/20/23. PERFORMED OPERATIONAL CK AND LEAK CK PER AMM 36-11-07 OPS CKS GOOD LW 77617 ALTERNATE DEACTIVATION REVERSED.