What was found
#2 ENG LT VSV DRAIN {IN ENGINE BOTTOM DRAIN CLUSTER }IS LEAKING 12 DROPS PER MINUTE. GROUNDED - YES. ON DEFERRAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
#2 ENG LT VSV DRAIN {IN ENGINE BOTTOM DRAIN CLUSTER }IS LEAKING 12 DROPS PER MINUTE. GROUNDED - YES. ON DEFERRAL.