What was found
PHX - DURING SCHEDULED D-CHECK, THE CREASE BEAM WEB BETWEEN STATION 727B AND 747 RT WAS FOUND CRACKED AND CORRODED. REPAIRED PER SRM 51-30-2. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PHX - DURING SCHEDULED D-CHECK, THE CREASE BEAM WEB BETWEEN STATION 727B AND 747 RT WAS FOUND CRACKED AND CORRODED. REPAIRED PER SRM 51-30-2. (M)