What was found
CAPTAIN REPORTED THAT DURING CRUISE AND DESCENT, THE CONTROL COLUMN WITH AFT AND FWD MOVEMENT ABOUT 2 INCHES. ACFT WAS SENT TO THE HANGAR AND MX PERFORMED A CONTROL COLUMN POWER FORCE TEST AND ELEVATOR MECHANISM CONDITION INSP IAW 27-31-00; ELEVATOR PITOT SYS LEAK TEST WAS ACCOMPLISHED IAW MM 27-31-17 TASK 27-31-17-790-801 AND THE ELEVATOR FEEL ACTUATOR WAS REPLACED IAW MM 27-31-67; OPS TEST WAS PERFORMED IAW FIM 27-31 TASK 812 AND ELEVATOR CONTROL CABLES ADJUSTMENT WAS PERFORMED IAW MM 27-31-00, TESTED CORRECT.