What was found
CAPTAIN REPORTED MAIN TANKS FUEL IMBALANCE FROM 300 KGS TO 400 KGS. MX PERFORMED CROSS FEED VALVE OPS TEST IAW MM 28-22-00, DETECTING THE RESULTS WERE OPS OUT OF LIMITS, BEING THE FUEL TRANSFERENCE OF 500 KGS IN TWO MINUTES. THE FUEL CROSSFEED VALVE WAS REPLACED IAW MM 28-22-21, TESTED CORRECT.