What was found
DURING TRANSIT CHECK, THE APU WAS SHUT OFF AUTOMATICALLY BY OVER TEMP. MX PERSONNEL PERFORMED FIM 49-30 TASK 802 PROCEDURE, CONFIRMING THE FAILURE, SO THE REPORT WAS DEFERRED IAW MEL 49-1, CAT C. AT MEX, MX PERSONNEL PERFORMED THE FIM 49-30 TASK 803 & OPERATIONAL TEST IAW AMM 49-11-00, TESTED CORRECT & THE REPORT WAS CLOSED.