What was found
DURING FUELING, A FUEL SPILLAGE IN THE LT TANK WAS DETECTED DUE TO THE SOV FAILURE. THE PLATFORM WAS CLEANED BY FIREMEN & MX PERSONNEL. CLOSED THE VLV MANUALLY & THE REFUELING SOV WAS DEFERRED BY MEL 28-10-2 CAT C. DURING OVERNIGHT CHECK, THE PRESSURE FUELING SYS TEST WAS PERFORMED IAW AMM 28-21-00, DETECTING THE FUEL QTY PROCESSOR DAMAGED, SO THE PROCESSOR WAS REPLACED IAW AMM 28-41-81, TESTED CORRECT.