As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING FUELING, A FUEL SPILLAGE IN THE RT TANK WAS DETECTED DUE TO THE SOV DID NOT CLOSE. THE PLATFORM WAS CLEANED BY FIREMEN & MX CLOSED THE VLV MANUALLY & THE REFUELING SOV WAS DEFERRED BY MEL 28-10-2 CAT C. THE FIM 28-21 TASK 809 PROCEDURE WAS PERFORMED CONFIRMING THE FAILURE OF THE RT TANK REFUELING SOV, IT WAS REPLACED IAW MM 28-21-51, TESTED CORRECT.