What was found
PERFORMED A LIGHTNING STRIKE INSPECTION IAW AMM 05-51-19, DETECTING A LIGHTNING STRIKE WITH DELAMINATION OF 3.5” LONG & 1.5” WIDE IN THE RT ELEVATOR TE. LIGHTNING STRIKE ON 3 FASTENERS IN THE RT ELEVATOR TE, ON RT ENG EXTERIOR THRUST REVERSER TE & ON 2 RT WING TE DISCHARGE STATICS. RT ELEVATOR TE WAS REPAIRED IAW SRM 55-20-01 REPAIR 1 PARA 4, TABLE 202. NDT INSPECTION WAS PERFORMED & NO DELAMINATION OR DISBANDS WERE FOUND IAW NDTM PART 4 51-00-01, 51-00-05. THE BALANCE PROCEDURE AT RT ELEVATOR WAS PERFORMED IAW SRM 51-61-04. THE RT ENG EXTERIOR THRUST REVERSER TE OUTER SKIN WAS REPAIRED IAW SRM 54-30-01 & THE RT HORIZONTAL STABILIZER DISCHARGE STATICS WERE REPLACED IAW AMM 23-61-00, ALL CORRECT.