What was found
DURING C-CHECK INSPECTION, THE FLOORBEAMS AT FRAMES 38 AND 39 WERE FOUND TO BE CORRODED BEYOND LIMITS. MAINTENANCE REMOVED AND REPLACED THE CORRODED FLOORBEAMS IAW SRM. AIRCRAFT WAS RELEASED FROM C-CHECK ON MARCH 21,2004. (ASOA04371)