Service difficulty report · Panel · Cndair CL6002C10

Difficulty date
December 29, 2008
Submitted
January 12, 2009
Operation
Air carrier
Aircraft
N659CA
Make and model
Cndair CL6002C10
Aircraft serial
10153
Aircraft time
12,031 hours, 8,536 cycles
System (JASC)
5755 · Spoilers
Part
Panel
Condition
Cracked
Location
Spoiler
Stage of operation
IN
How discovered
E
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LT WING MULTI-FUNCTION SPOILER CLOSEOUT PANEL CRACKED AT INBD AFT CORNER. R & R RT MFS CLOSE OUT PANEL IAW SRM 51-42-06, 51-42-13, 51-42-21. REFER TO M-234 FORM FOR WORK ACCOMPLISHED. REMOVED MFS CLOSEOUT PANEL PER SRM 51-42-00. REMOVED RT O/B FLAP VANE PER CMM 57-53-02. FITTED & DRILLED RT MULTI FUNCTION SPOILER CLOSEOUT PANEL PER SB670BA-57-010 & SRM 51-40-11. COUNTER SUNK & FINAL SIZED MULTI-FUNCTION SPOILER MOUNTING HOLES & DRILLED P-SEAL FASTENER HOLES PER SB670BA-57-010. OK TO INSTALL. INSTALLED IAW SRM 51-42-21 & 51-42-06 REFERENCE FASTENERS SB670BA-57-010. RESTORED A023 FINISH ON RT MFS CLOSE OUT PANEL IAW SRM 51-21-06. INSTALLATION OF RT FLAP VANE PERFORMER ICW EO 700-57-0062.