What was found
FS 280 FLOORBEAM IS CORRODED (LT OF BL0). LT FS 280 FLOORBEAM (LT OF BL 0). REMOVED AND REPLACED PER SRM 51-42-06 & 51-42-21. REMOVED LEFT BEAM IAW SRM 700 51-42-06 AND 51-42-21. PILOT DRILLED L/S FS 280 FLOORBEAM PER SRM 51-41-00. FINAL SIZED HOLES IN L/S FLOORBEAM AND WET INSTALLED TITANIUM DOUBLES AND U-BRACKET IAW SRM 51-42-21- AND 51-42-06. OK TO INSTALL LT FLOORBEAM. STARTED INSTALLING LT FS 280 FLOORBEAM PER SRM 51-42-06. INSTALLED WET WITH PS870C12. PICKED UP FASTENER HOLES FOR CENTER SPLICE IAW REO 670-53-11-047. OK TO INSTALL CENTER SPLICE. REFER TO W/O 109650 N/R-00217 FOR DISPOSITION. FINISHED INSTALLING FASTENERS IN LT FS 280 BEAM EXCEPT FASTENERS COMMO