What was found
SUSPECT PRESSURE BULKHEAD 202 CRACKED AT PARKING BRAKE CABLE, IN FOUR LOCATIONS AT 1:00, 7:00 X2 AND 10:00 POS. COMPLIED WITH EDDY CURRENT INSPECTION OF 202 BULKHEAD AND CONFIRMED FOUR AREAS AT THE 1:00, 7:00 X2 AND 10:00 POS TO BE CRACKED. ALL WORK IAW NDTM 51-20-06 PART 1. REMOVED STIFFNER AND T-BRACKET FROM 202 BULKHEAD. FABRICATED -1-2-3-4 AND -5 IAW SRM 51-42-06 AND EC/TC REO 601R-53-11-563. RII COMPLIED WITH SATISFACTORY IAW SP 607 AND EC/TC REO 601R-53-11-1719.