What was found
FS 409+128 VERTICAL POST LBL 18.0 O/B POST HAS INDICATION NOTED APPROX .2" IN LENGTH 50% FSH AT AFT FLANGE WL 69.0 FAILED NDT INSPECTION. REMOVED INBD AND OTBD VERTICAL POSTS PER SRM 51-42-06. FABRICATED REPLACEMENT POST IAW SRM 51-24-21, REF SWG 601532208. LOCATED & DRILLED NEW O/B POST IAW SRM 51-40-11. INSTALLED I/B & O/B POSTS IAW SRM 51-42-06 & 51-42-22. COMPLIED WITH EC/TC REO 601R-53-41-889 & MET ALL THE REQUIREMENTS OF REO 601R-53-41-889.