What was found
FS280 EXFOLIATED ON LT AND RT AND CTR OF BEAM. REMOVE LT & RT INTERCOSTALS PER SRM 51-42-21-001-001-A01. COMPLIED WITH GVI ON LT & RT INTERCOSTALSN. INSTALLED LT & RT INTERCOSTALS PER SRM 51-42-21-001-001-A01. REMOVED LBL9.0 & RBL9.0 ANGLES & DIAGONAL BRACKETS IAW SRM 51-42-22-001-001-A01 & 51-42-21-001-001-A01. COMPLIED WITH GVI OF LT & RT LBL & RBL P.0 ANGLES & DIAGONAL BRCAKETS. INSTALLED RBL 9.0 & LBL 9.0 7 ANGLES & DIAGONAL BRACKETS PER REO 670-53-11-047 REV E DATED 2009/08/13. DISCONNECTED LT & RT PULLEY BRACKETS AT FS 280 IAW 51-41-00-001-001-A01. COMPLIED WITH GVI LT & RT PULLEY BRACKETS. RE-CONNECTED (INSTALLED) LT & RT AILERON PULLEY BRACKETS PER SRM 51-42-06-001-001-A01. REMOVED FS 280 FLOORBEAM IAW SRM 51-42-06-001-001-A01 & 51-42-21-001-001-A01. MATCH DRILLE NEW FS 280 FLOORBEAM AS PER SRM 51-40-11 BEAM. INSTALLED NEW FS 280 RT BEAM PER SRM 51-42-06-001-001-A01 & SRM 51-42-21-001-001-A01. REMOVED JB-2 PER AMM 24-01-01-000-801. REMOVED JB-3 PER AMM 24-02-01-000-801. PERFORMED GVI JB-2 NO DEFECTS NOTED. PERFORMED GVI JB-3 NO DEFECTS NOTED. REINSTALLED JB-2 PER AMM 24-01-01-400-801. OPS CHECKS ACCOMPLISHED ON W/O 7121015/91. REINSTALLED JB-3 PER AMM 24-02-01-400-801 OPS CHECKS ACCOMPLISHED W/O 7121015/91. PERFORMED GVI OF MODSUM PARTS NO DEFECTS NOTED. REMOVED MODSUM PARTS FROM LT & RT 280 BEAM PER SRM 51-42-21-001-00