What was found
FUSELAGE FRAME HAS CORROSION FS 333.0 STR 26L TO STR 27. REMOVED FUSELAGE FRAME AT FS 333.00 STR 23L-23R IAW SRM 51-42-06 & 51-42-21. NEW FRAME SECTOR REQUIRES LOCATED, DRILLED, AND INSTALLED. NEW FRAME SECTOR IS LOCATED AND DRILLED IAW 51-42-06 STEP 7 A & B AND 51-42-21 STEP 5 A, B, & C. NEW FRAME SECTOR REQUIRES INSTALL. NEW FRAME SECTOR AT FS 333.0 STR 23L-23R INSTALLED IAW SRM 51-42-06 AND 51-42-21. REQUIRES PAINT. PAINTED REPAIRED AREA IAW SRM 51-25-01.