Service difficulty report · Attach Bracket · Cndair CL6002B19

Difficulty date
March 5, 2010
Submitted
March 10, 2010
Operation
Air carrier
Aircraft
N858AS
Make and model
Cndair CL6002B19
Aircraft serial
7417
Aircraft time
23,582 hours, 19,533 cycles
Engine
Ge CF343B1
Part
Attach Bracket
Condition
Cracked
Location
Bulkhead
Stage of operation
IN
How discovered
E
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFT PRESSURE BULKHEAD IS CRACKED ABOVE LINTEL ATTACH BRACKET, AREA IS MARKED. REMOVED ALL ANGLES AND BRACKETS FWD OF FS 621 BULKHEAD NESSESARY FOR LINTEL FITTING REPAIR IAW SRM 51-42-21 AND 51-42-06 FOR REO 601R-53-61-1230. PARTS ORDERED FOR FWD SIDE. REMOVED INTERCOSTAL WITH ANGLES, MADE CUTOUT ON LINTEL CHANNEL DOUBLER THEN DROPED LINTEL FITTING DOWN TO FACILITATE BULKHEAD CUTOUT IAW REO 601R-53-61-1230. CUTOUT TO LINTEL CHANNEL DOUBLER REQUIRES NDT. PERFORMED ET INSP OF CUTOUT ON LINTEL CHANNEL DOUBLER IAW EC/TC (TC REO 601R-53-61-1230 STEP 5 PER NDTM PART 1,51-20-06 NO INDICATIONS NOTED AT THIS TIME.