Service difficulty report · Floor Support · Cndair CL6002B19

Difficulty date
August 9, 2010
Submitted
August 16, 2010
Operation
Air carrier
Aircraft
N926EV
Make and model
Cndair CL6002B19
Aircraft serial
7843
Aircraft time
16,776 hours, 14,636 cycles
Engine
Ge CF343B1
Part
Floor Support
Condition
Cracked
Location
Bs 621
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLOOR SUPPORT CRACKED IN CARGO COMPARTMENT AT AFT PRESSURE BULKHEAD UNDER PANEL 281LLF. REMOVED LT FS 621 FLOOR SUPPORT ANGLE LT SIDE REF SRM 51-42-06 AND 51-42-21. DRILLED COUNTERSUNK AND TRIMMED NEW FLOOR SUPPORT ANGLE REF SRM 51-40-11. STARTED INSTALLING LT FS 621 FLOOR SUPPORT ANGLE REF SRM 51-42-21. CONTINUE INSTALLING LT FS 621 FLOOR SUPPORT ANGLE. FINISHED INSTALLING FASTNERS ON LT FS 621 FLOOR SUPPORT ANGLE REF SRM 51-42-06.