Service difficulty report · Pressure Panel · Cndair CL6002B19

Difficulty date
February 21, 2011
Submitted
March 9, 2011
Operation
Air carrier
Aircraft
N821AS
Make and model
Cndair CL6002B19
Aircraft serial
7194
Aircraft time
30,571 hours, 27,977 cycles
Part
Pressure Panel
Condition
Damaged
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PRESSURE PANEL 132AL FUSELAGE CUTOUT HAS ON DAMAGED AND ELONGATED FASTENER HOLE. COMPLIED WITH EC/TC REO 601R-53-11-162 REPAIR TO PRESSURE PANEL 132 AL FUSELAGE CUTOUT FASTENER HOLE IAW REO 601R-53-11-162 REV. B THIS IS A MAJOR REPAIR.