Service difficulty report · Sensing Element · Cndair CL6002B19

Difficulty date
July 22, 2011
Submitted
September 20, 2011
Operation
Air carrier
Aircraft
N827AS
Make and model
Cndair CL6002B19
Aircraft serial
7212
Aircraft time
32,565 hours, 28,932 cycles
Part
Sensing Element
Condition
Failed
Location
Overheat Detect
Stage of operation
CL
How discovered
O
Nature of condition
N
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER TO CLIMBING THRU APPRX 3000 FT, MLG BAY OVERHEAT MSG COMPLY WITH QRH MSG EXTINGUISHED. ACFT RETURNED TO DEPARTURE AFTER T/O -- EMERGENCY DECLARED AS A PRECAUTION. MLG BAY OVERHEAT DETECTION SYS (BTMS OPERATIVE) - SYS DEACTIVATED. R & R BOTH LT & RT SENSING ELEMENTS IAW AMM 26-14-04. OPS CHECK GOOD, DEFER CLEARED, PLACARD REMOVED.