What was found
FS 409+128 BULKHEAD VERTICAL POST AT LBL 27 INBD SIDE IS CRACKED IN RADIUS ON BOTTOM EDGE OF POST. COMPLIED WITH STEPS 1 AND 2 OF REO 601R-53-41-056. STEPS 3-17 OF REO 601R-53-41-056, REQUIRE COMPLIANCE. COMPLIED WITH STEP 3 OF REO 601R-53-41-056, REV F. PERFORMED EDDY CURRENT OF FS 409+128 VERTICAL POST LBL 27 INBD SIDE REPAIR IAW NDTM 51-20-06. NO INDICATIONS NOTED AT THIS TIME. REMOVED PANEL 191BB FOR ACCESS IAW AMM TASK 53-85-01-000-803. OK TO CLOSE PANEL 191BB. INSTALLED PANEL 191BB IAW AMM TASK 53-82-01-400-803. COMPLIED WITH STEPS 4-17 OF REO 601R-53-41-056. COMPLIED WITH ECTC REO 601R-53-41-056 IAW REO 601R-53-41-056, REV F. RII FOUND TO BE SATISFACTORY: WVAC 1. (SDR CLOSED)