Service difficulty report · Duct · Emb EMB145LR

Difficulty date
July 12, 2013
Submitted
July 16, 2013
Operation
Air carrier
Aircraft
N13988
Make and model
Emb EMB145LR
Aircraft serial
145265
Aircraft time
32,054 hours, 24,093 cycles
Part
Duct
Condition
Loose
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CREW REPORTED PACK NR 2 VALVE CLOSED ON EICAS MESSAGE IN FLIGHT WHICH RESULTED IN LOSS OF BOTH AIR CONDITIONING PACKS AND PRESSURIZATION DUE TO NR 1 PACK BEING ON MEL. MX PERFORMED SERVERAL OPERATIONAL CHECKS OF THE PACK NR 2 SYS SUCCESSFUL WITH NO MESSAGES NOTED ON THE EICAS. MX ALSO RESECURED A BLOWN OFF DUCT AND CLAMPS ON THE NR 1 PACK. ACFT WAS APPROVED FOR RETURN TO SERVICE.

More about the Emb EMB-145LR