Service difficulty report · Bushing · Cndair CL6002B19

Difficulty date
August 8, 2014
Submitted
August 29, 2014
Operation
Air carrier
Aircraft
N917EV
Make and model
Cndair CL6002B19
Aircraft serial
7769
Aircraft time
24,931 hours, 23,729 cycles
Part
Bushing
Condition
Corroded
Location
Horizontal Stab
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

LEFT SIDE HORIZONTAL STABILIZER HINGE BUSHINGS HAVE CORROSION. REMOVED THE LT AND RT OTBD PIVOT BUSHINGS, INSPECTED THE BORES AND FOUND TO BE GALLED IAW RIL 3039, SB 601R-55-007, REV D, PART C. REMOVED GALLING WITH 1ST OVERSIZE REAMER 1.7151 DIA- 203-402 REAMER IAW SB601R-55-007, REV D, PART C ON LT AND RT OTBD HORIZONTAL LUGS A2A-C. INSTALLED LT AND RT OTBD PIVOT BUSHINGS AND FINAL REAM. INSTALLED LT AND RT OTBD BUSHINGS IN HORTIZONTAL STABILIZER AND FINAL REAMED TO SIZE IAW SB 601R-55-007, REV D, PART C 2D-E. REMOVED HORIZONTAL STABILIZER LT & RT INBD PIVOT BUSHINGS, INSPECTED BORES AND FOUND TO BE GALLED IAW RIL 3039, SB 601R-55-007, REV D, PART C. INSTALLED LT & RT INBD PIVOT BUSHINGS IN HORIZONTAL STABILIZER AND REAMED TO SIZE IAW SB601R-55-007, REV D, PART C, SUB D-W & RIL 3039. COMPLIED WITH REO 601R-55-11-02 AND EC/TC REO601R-55-11-022.