What was found
RIGHT BOOST PUMP CUTOUT HAS MULTIPLE INDICATIONS ALL AROUND THE VERTICAL & HORIZONTAL LANDINGS 50 PERCENT FSH. FAILED NDT INSPECTION. REMOVED CORROSION ON VERTICAL AND HORIZONTAL LANDINGS IAW SRM 51-21-06. ORIGINAL THICKNESS .150", REMOVED .007" FROM HORIZONTAL LANDING AND .007" FROM VERTICAL LANDING. REMAINING THICKNESS .143". RECEIVED STS EA 32-2015-024 AND PERFORMED REPAIR STEPS SECTION 1 PERMANENT REPAIR.