What was found
LIGHTING STRIKE TEMP FASTENER AT FS 661+62 BETWEEN STRS 12L + 13L. TEMP FASTENER AT FS661 BETWEEN STR 12L + 13L REMOVED FINISH AT TEMP FASTENER IAW SRM 51-26-00-001-001-A01 REMOVED TEMP FASTENER IAW SRM 51-42-13-001-001-A01. INSTALLED RIVETS IAW SRM TEMPORARY REV 53-0050, TYPE 3B PERMANENT REPAIR TASK 57-00-00-201-006-A03 AND RESTORE FINISH IAW SRM 51-21-16. PERFORMED CONDUCTIVITY TEST OF FUSELAGE SKIN IAW SRM 53-00-00-201-003-A03, TR53-0050 CONDUCTIVITY READING IS 33.94 PERCENT IACS READING IS WITHIN LIMITS SRM 51-11-20-001-001-A01 PERFORMED EDDY CURRENT INSPECTION OF FUSELAGE SKIN AT FS 661+32 STR 12L-13L IAW NDTM PT.1, 51-20-006-250-A01 NO INDICATIONS NOTED AT THIS TIME.