As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
FS 621 BULKHEAD AFT SIDE INTERCOSTAL IS CRACKED AT STR 14L. DRILLED, LOCATED FASTENERS AS REQUIRED ON NEW INTERCOSTAL. WORK PERFORMED IAW SRM 51-42-06, 51-42-21 & 51-77-00. INSTALLED NEW INTERCOSTAL AT STR 14L IAW SRM 51-42-06, 51-42-21 & 51-77-00.