What was found
CORROSION AROUND 3 SCREW HOLES ON RBL 9 FLOORBEAM AND FS 559+112 CROSSBEAM UNDER PNL 282LRF. REMOVED CORROSION FROM FLOORBEAM, RBL9 A FS 559+112 AND ON CROSS MEMBER CAP AT FS 559+112 OTBD 9 BEAM IAW SRM 51-21-06. FLOORBEAM EXTRUSION FOUND TO HAVE COMPLETE MATERIAL LOSS BETWEEN FS 559.00+96 TO 559.00+112 AND IS OUT OF LIMITS SRM 53-00-00. EVALUATED DAMAGED AREA AND FOUND TO BE WITHIN LIMITS IAW SRM 53-00-00. REPAIRED FLOORBEAM AT FS559+96-559+112 IAW SRM 53-00-43, REPAIR NR 2 FLOORBEAM SPLICE REPAIR.