What was found
LOST CABIN PRESSURIZATION AT 20,000 FT IN ICING CONDITIONS. SELECTED MANUAL AND THE VALVE WOULD NOT CLOSE ALL THE WAY. MASKS DROPPED SUSPECT ICING AFTER 30 MINUTE HOLD. OPERATED OUTFLOW VALVE AND PRESSURIZED TO 3 PSI, OPS NORMAL REF MM 21-32. MASK DROPPED CHECK AND REPACK MASK, NO DEFECTS NOTED.