SDR AU000425

Service difficulty report · Main Rotor · Bell 206B3

Difficulty date
June 1, 2000
Submitted
July 4, 2000
Operation
General aviation
Make and model
Bell 206B3
Engine
Allsn 250C20B
Part
Main Rotor
Condition
Damaged
Location
Split Cone Half
Part time
2,616 cycles
Component
Main Rotor Head · Bell · TRUNNION
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

(AUS) MAIN ROTOR SPLIT CONE HALF INSTALLED UPSIDE DOWN. MAIN ROTOR TRUNNION CHAMFER DAMAGED BY SHARP EDGE OF CONE. MAST SPLIT CONE SEAT FRETTING.

More about the Bell 206B-3