What was found
(AUS) SECOND STAGE STATOR FAULTY. STATOR WAS RECEIVED FROM THE OVERHAUL FACILITY WITH ZERO HOURS TSN. UPON INSPECTION ONLY ONE SCREW HOLE OUT OF TWELVE WAS ABLE TO ACCEPT A BOLT. THE BOLTS ATTACH THE ITT HARNESS.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(AUS) SECOND STAGE STATOR FAULTY. STATOR WAS RECEIVED FROM THE OVERHAUL FACILITY WITH ZERO HOURS TSN. UPON INSPECTION ONLY ONE SCREW HOLE OUT OF TWELVE WAS ABLE TO ACCEPT A BOLT. THE BOLTS ATTACH THE ITT HARNESS.