What was found
(AUS) FUSELAGE FRAMES CRACKED AT PSU ATTACHMENT POINTS. FOUR FRAMES ONTHE LT SIDE AND THREE FRAMES ON THE RT SIDE CRACKED. FOUND DURING EDDY CURRENT INSPECTION IAW EI 737-53-68R1 AND NDT TECHNIQUES E-13 AND E-18.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(AUS) FUSELAGE FRAMES CRACKED AT PSU ATTACHMENT POINTS. FOUR FRAMES ONTHE LT SIDE AND THREE FRAMES ON THE RT SIDE CRACKED. FOUND DURING EDDY CURRENT INSPECTION IAW EI 737-53-68R1 AND NDT TECHNIQUES E-13 AND E-18.