What was found
(AUS) RT ENGINE FAILED TO ACHIEVE TAKEOFF POWER. THRUST SHORTFALL REQUIRED WAS 1.73 BUT ONLY 1.71 WAS ACHIEVED WITH ASSOCIATED EICAS MESSAGE RT ENGINE RPM LIMIT. TAKE OFF WAS ABORTED AT 110 KNOTS GROUND SPEED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
(AUS) RT ENGINE FAILED TO ACHIEVE TAKEOFF POWER. THRUST SHORTFALL REQUIRED WAS 1.73 BUT ONLY 1.71 WAS ACHIEVED WITH ASSOCIATED EICAS MESSAGE RT ENGINE RPM LIMIT. TAKE OFF WAS ABORTED AT 110 KNOTS GROUND SPEED.