As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
(AUS) DURING INSPECTION IAW AD/DHC-8/027 THE FOLLOWING WAS OBSERVED:- 1. RT ROW 2 PSU PCB SHOWS EVIDENCE OF OVERHEATING AT CONNECTIONS TO Q2.2. RT ROW 4 PSU PCB SHOWS EVIDENCE OF OVERHEATING AT CONNECTIONS TO J2.3. RT ROW 8 PSU PCB SHOWS EVIDENCE OF OVERHEATING AT CONNECTIONS TO J2.