Service difficulty report · None · Bombdr BD1001A10

Difficulty date
February 20, 2022
Submitted
February 26, 2022
Operation
Air carrier
Aircraft
N545XJ
Make and model
Bombdr BD1001A10
Aircraft serial
20278
Aircraft time
13,871 hours, 6,181 cycles
Part
None
Condition
None
Stage of operation
CR
How discovered
V
Nature of condition
J, K, S
Precautionary procedure
A, O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

WHILE AT ALTITUDE, FLIGHT CREW RECEIVED A CYAN "R ENG HYD PUMP FAIL" CAS MESSAGE AND 0% QUANTITY SHOWING ON THE RH HYDRAULIC SYSTEM. CREW RAN THE APPROPRIATE CHECKLIST AND DECLARED AN EMERGENCY WITH ATC. AFTER CONSULTING WITH MX CONTROL, THE DECISION WAS MADE TO DIVERT TO SLC, WHERE THEY LANDED WITHOUT INCIDENT. MAINTENANCE FOUND THE #2 BRAKE SOV LEAKING AT A HYDRAULIC LINE B-NUT. THE B-NUT WAS PROPERLY TORQUED AND LEAK CHECK WAS NORMAL. THE RH HYDRAULIC CASE DRAIN AND PRESSURE FILTERS WERE INSPECTED FOR DEBRIS, WITH NO DEFECTS NOTED. THE RH ENGINE HYDRAULIC PUMP (PN: 51160-06) WAS REPLACED WITH A REPAIRED UNIT, LEAK AND OPERATIONAL CHECKS WERE NORMAL. THE AIRCRAFT WAS RETURNED TO SERVICE.