What was found
C-CHECK, TEMPORY REPAIR DOUBLER INSTALLED WITH CHERRY MAX RIVETS AT BS 280 BETWEEN STR 17 - 19L. REMOVED TEMP REPAIR, FABRICATED DOUBLER AND FILLER AND INSTALLED PERMANENT REPAIR IAW 737 SRM 53-00-01 MATERIAL USED 2024 T3 X .090 FILLER 2023 T3X .071. TREATED, PRIMED, AND INSTALLED IAW 737 SRM 53-00-01 FIG 201.