What was found
DURING BC-02 CHECK FWD LT EMERGENCY POWER SUPPLY UNIT (EPSU) 10WL FAILED LOAD TEST, RECEIVED MESSAGE ON PROGRAM AND TEST PANEL. MAINTENANCE REMOVED AND REPLACED THE FWD LT EPSU 10WL IAW 33-51-38-401, OPERATIONAL CHECK WAS GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING BC-02 CHECK FWD LT EMERGENCY POWER SUPPLY UNIT (EPSU) 10WL FAILED LOAD TEST, RECEIVED MESSAGE ON PROGRAM AND TEST PANEL. MAINTENANCE REMOVED AND REPLACED THE FWD LT EPSU 10WL IAW 33-51-38-401, OPERATIONAL CHECK WAS GOOD.