What was found
YWG - MAJOR REPAIR - DURING C-04 CHECK EXFOLIATION CORROSION WAS FOUND FLOORBEAM AT Y765 RT, FR 67-68. MAINTENANCE REMOVED CORRODED FLOORBEAM FROM FR 67-70, Y765 RT, FABRICATED AND INSTALLED A NEW FLOORBEAM IAW A320 SRM 53-41-14, FIG 8 PG 34B.